Building B:

  • Exterior/interior wall framing
  • Rough MP&E/fire ongoing
  • Roof are being dried in
  • Exterior painting ongoing
  • Interior floor grinding finished
  • Exterior concrete being prepped/poured

Site:

  • Dirt grading ongoing
  • Landscaping ongoing